 The Spirit of Lexington
Building of 1987 28-foot pontoon with 115 hp Mercury
We named it the “Lexington” in honor of the City of Lexington, Mo. The people there have been so kind to us as we have visited their city with the Young Women's organization of the LDS Church. There have been three years in 2005 of summer camping trips by river and Lexington is one of our first stops.
HULL NO BUJ76038C787 TRACKER 1987 CAPACITY 12 PERSONS MAX LOAD WT 2900 LBS UNLADEN WT 3400 LBS BEAM 8 FT LENGTH 30 FT TRAILER HT 12.5 FT
10 weeks till Embarkation

We found this old Pontoon thinking we could take the kids on a river trip
Pick up tritoon, “Tracker 28 Foot Party Hut” All of the flooring and sides of the cabin were rotten and unsafe, nothing but the aluminum could be used.
Had to take everything off to repair the floor
4/6/03 Sun
4/12/03 Sat Take off Hut and sides Talked to Norm Clark about getting marine plywood, boy! 10 sheets of that was a lot of $.
We bought the boat because of the pontoons, didn't know we'd get a working motor out of the deal.

The floor was a mess
4/19/03 Sat Take off floor
 
Took some work to get the floor off, no power tools at the RV lot
4/22/03 Tue Got Plywood

Coated 3/4" marine ply with epoxy, bolted down and covered with carpet .4/23/03 Wed Cut out sides
4/24/03 Thursday Two panels resin, sides made on con
Making the helm at home 4/26/03 Sat PUT on FLOOR, Make cabin bridge, galley cabinet. GOT floor on
4/28/03 Mon Take old galley apart, make galley walls, begin head walls


Attaching rails, lights, and trim
5/1/03 Thursday Pick up carpet. Make galley pannels
5/10/03 Sat Committee members came over to help clean parts Fiber glass work, sanding and grinding

Yes, it began to rain
5/23/03 Fri We added a rear awning for shade and a rear service deck around the motor. We also built an enclosed bridge instead of the original control stand. 18 days left
5/24/03 Sat help from HC members Get new truck to haul trailer at 12:00 from Olathe Ford
5/26/03 Mon Memorial Day OFF, Assemble cabin

Inside the cabin looking forward, all the aluminum is cleaned and polished
5/29/03 Thursday Must finish painting, and get lower gear box back on motor
6/7/03 Sat 1 week, assembly, motor testing

First running of the motor, had a problem--time is really short now 6/14/03 Carbs leaking gas, Alan and Scott going to stores while I rebuild fuel pump and carbs.
6/16/03 Week of 5th year camp Launch, still finishing the wiring.

Scott at Lexington's helm, we're still hooking up wires

View from Lexington's helm, the Missouri River
On her first check out ride, we took the boat and 30 some people 311 miles down the Missouri River and only had a few problems but they were fixed.
6/22/03 Sun
|